Question:
Both Huawei
SCUB and Huawei SCUN have four GE optical ports, which can function
as upstream ports. How to set the GE optical port of the control board (SCUB/SCUN)
as upstream ports when upstream transmission is not implemented by the GIU
board?
Answer:
Switching
to the upstream port of the SCUB is controlled by the electronic switch. At a
time, only the upstream port of the GIU board or the port of the control board
can be used for upstream transmission.
Note: In the case of the
SCUB, make sure that the current configuration of the system is already saved
before running the electro-switch command. After this command is run, the
system will be reset.
A To set the
port of the control board as the upstream port, run the electro-switch 0
location-0
command.
B To set
the port of the GIU board as the upstream port, run the electro-switch 0
location-1
command.
C The SCUN
can work with the Huawei EPON GIU upstream board. In this case, the SCUN equals an
upstream
board in another GIU slot.
http://huaweis5700.over-blog.com/
回复删除huawei s5700 review